{"id":13943,"date":"2025-09-30T17:18:00","date_gmt":"2025-09-30T15:18:00","guid":{"rendered":"https:\/\/www.leaplytics.de\/?p=13943"},"modified":"2025-09-30T18:24:50","modified_gmt":"2025-09-30T16:24:50","slug":"no-datiem-uz-prognozesanu-izmantojot-power-bi-gudrakai-riska-parvaldibai","status":"publish","type":"post","link":"https:\/\/www.leaplytics.de\/lv\/no-datiem-uz-prognozesanu-izmantojot-power-bi-gudrakai-riska-parvaldibai\/","title":{"rendered":"No datiem l\u012bdz prognoz\u0113\u0161anai: Power BI izmanto\u0161ana gudr\u0101kai riska p\u0101rvald\u012bbai"},"content":{"rendered":"<div class=\"blog-post\">\n<p>Risku p\u0101rvald\u012bba bez datiem ir tikai min\u0113jumi. Un min\u0113jumi izn\u012bcina projektus.<\/p>\n<p>M\u0113s esam redz\u0113ju\u0161i, k\u0101 uz\u0146\u0113mumi sadedzina miljonus, jo nav sp\u0113ju\u0161i saskat\u012bt gaid\u0101m\u0101s probl\u0113mas. Br\u012bdin\u0101juma z\u012bmes bija redzamas. Dati bija pieejami. Bet neviens nesavienoja visus punktus, l\u012bdz bija par v\u0113lu.<\/p>\n<p>Power BI maina \u0161o sp\u0113li. T\u0101 p\u0101rv\u0113r\u0161 j\u016bsu izklied\u0113tos riska datus par krist\u0101la bumbu j\u016bsu projektiem. Ne ma\u0123ija - tikai gudri izmantota jau eso\u0161\u0101 inform\u0101cija.<\/p>\n<p>L\u016bk, k\u0101 m\u0113s pal\u012bdzam organiz\u0101cij\u0101m p\u0101riet no rea\u0123\u0113jo\u0161as ugunsgr\u0113ku dz\u0113\u0161anas uz prognoz\u0113jamu riska p\u0101rvald\u012bbu.<\/p>\n<h2>K\u0101p\u0113c tradicion\u0101l\u0101 riska p\u0101rvald\u012bba ir neveiksm\u012bga<\/h2>\n<p>Liel\u0101k\u0101 da\u013ca riska p\u0101rvald\u012bbas ir te\u0101tris. Skaistas izkl\u0101jlapas ar sarkanu, dzeltenu un za\u013cu kr\u0101su. Ikm\u0113ne\u0161a san\u0101ksmes, kur\u0101s visi klan\u0101s un saka \"m\u0113s uzraug\u0101m situ\u0101ciju\".<\/p>\n<p>Probl\u0113ma? J\u016bsu riska re\u0123istrs ir statisks dokuments. J\u016bsu projekta dati atrodas cit\u0101 sist\u0113m\u0101. J\u016bsu finan\u0161u dati sl\u0113pjas gr\u0101matved\u012bbas programmat\u016br\u0101. Nekas nav savienots ar jebko citu.<\/p>\n<p>Kad risks materializ\u0113jas, j\u016bs cen\u0161aties saprast, kas noticis. J\u016bs apkopojat zi\u0146ojumus no pieciem da\u017e\u0101diem avotiem. L\u012bdz br\u012bdim, kad jums ir atbildes, kait\u0113jums jau ir nodar\u012bts.<\/p>\n<p>\u0160o modeli m\u0113s redzam visur:<\/p>\n<ul>\n<li>Bud\u017eeta p\u0101rt\u0113ri\u0146\u0161, kas \"n\u0101ca no nekurienes\" - iz\u0146emot to, ka izdevumu dati par\u0101d\u012bja tendenci jau tr\u012bs m\u0113ne\u0161us iepriek\u0161.<\/li>\n<li>Resursu tr\u016bkums, ko \"nevar\u0113ja paredz\u0113t\" - kam\u0113r izmanto\u0161anas zi\u0146ojumi kliedza br\u012bdin\u0101jumus.<\/li>\n<li>Kvalit\u0101tes probl\u0113mas, kas \"p\u0113k\u0161\u0146i par\u0101d\u012bj\u0101s\", lai gan defektu skaits bija pieaudzis jau vair\u0101kas ned\u0113\u013cas.<\/li>\n<\/ul>\n<p>Dati bija pieejami. Redzam\u012bba nebija.<\/p>\n<h2>Power BI k\u0101 j\u016bsu riska izl\u016bko\u0161anas platforma<\/h2>\n<p><a href=\"\/lv\/priekseja-lapa\/projektu-vadiba-pielagotas-vizualizacijas-microsoft-powerbi\/riska-karstumkarte-pielagota-vizuala-karte-jaudas-bi\/\">Power BI ne tikai veido skaistas diagrammas<\/a>. Tas savieno riska punktus, pirms tie k\u013c\u016bst par riska spr\u0101dzieniem.<\/p>\n<p>Uzskatiet to par savu riska vad\u012bbas centru. Visi svar\u012bg\u0101kie datu avoti tiek apkopoti vien\u0101 viet\u0101. Projektu vad\u012bbas r\u012bki, finan\u0161u sist\u0113mas, person\u0101la datu b\u0101zes, kvalit\u0101tes r\u0101d\u012bt\u0101ji - visi run\u0101 vien\u0101 valod\u0101.<\/p>\n<p>M\u0113s veidojam pane\u013cus, kas par\u0101da tr\u012bs lietas:<\/p>\n<ul>\n<li><strong>Kas notiek tagad<\/strong> - Re\u0101llaika projektu st\u0101voklis vis\u0101s j\u016bsu iniciat\u012bv\u0101s<\/li>\n<li><strong>K\u0101di mode\u013ci par\u0101d\u0101s<\/strong> - Tendences, kas \u013cauj prognoz\u0113t probl\u0113mas, pirms t\u0101s radu\u0161\u0101s<\/li>\n<li><strong>K\u0101das darb\u012bbas veikt<\/strong> - Skaidri n\u0101kamie so\u013ci, pamatojoties uz datiem<\/li>\n<\/ul>\n<p>Burv\u012bba rodas tad, kad p\u0101rst\u0101jat skat\u012bties uz atsevi\u0161\u0137iem r\u0101d\u012bt\u0101jiem un s\u0101kat saskat\u012bt kopsakar\u012bbas. Bud\u017eeta novirze plus resursu izmanto\u0161ana plus laika grafiku spiediens ir vien\u0101ds ar projektu, kas dr\u012bz sabruks.<\/p>\n<p>Power BI padara \u0161os savienojumus redzamus. Redzam\u012bba rada iesp\u0113jas.<\/p>\n<h2>Riska noteik\u0161anas sist\u0113mas izveide<\/h2>\n<p>M\u0113s neizgatavojam inform\u0101cijas pane\u013cus. M\u0113s veidojam agr\u012bn\u0101s br\u012bdin\u0101\u0161anas sist\u0113mas.<\/p>\n<p>S\u0101ciet ar liel\u0101kaj\u0101m s\u0101p\u0113m. K\u0101di riski jums s\u0101p visvair\u0101k? Bud\u017eeta iztr\u016bkumi? Grafiku kav\u0113jumi? Resursu konflikti? Kvalit\u0101tes neveiksmes?<\/p>\n<p>Katrai galvenajai riska kategorijai nor\u0101diet vado\u0161os r\u0101d\u012bt\u0101jus. Ne tos ac\u012bmredzamos, bet smalkus sign\u0101lus, kas par\u0101d\u0101s da\u017eas ned\u0113\u013cas pirms kr\u012bzes.<\/p>\n<p><strong>Bud\u017eeta riska r\u0101d\u012bt\u0101ji:<\/strong><\/p>\n<ul>\n<li>Faktisko un pl\u0101noto izdevumu \u0101trums<\/li>\n<li>Izmai\u0146u piepras\u012bjumu bie\u017eums un v\u0113rt\u012bba<\/li>\n<li>P\u0101rdev\u0113ju maks\u0101jumu kav\u0113jumi<\/li>\n<li>Iepirkuma pas\u016bt\u012bjuma apstiprin\u0101\u0161anas laiks<\/li>\n<\/ul>\n<p><strong>Pl\u0101na riska r\u0101d\u012bt\u0101ji:<\/strong><\/p>\n<ul>\n<li>Uzdevumu izpildes r\u0101d\u012bt\u0101ji sal\u012bdzin\u0101jum\u0101 ar b\u0101zes l\u012bniju<\/li>\n<li>Kritisk\u0101 ce\u013ca bufera pat\u0113ri\u0146\u0161<\/li>\n<li>Resursu pieejam\u012bbas prognozes<\/li>\n<li>Atkar\u012bbu pabeig\u0161anas kav\u0113jumi<\/li>\n<\/ul>\n<p><strong>Kvalit\u0101tes riska r\u0101d\u012bt\u0101ji:<\/strong><\/p>\n<ul>\n<li>Defektu atkl\u0101\u0161anas r\u0101d\u012bt\u0101ji pa posmiem<\/li>\n<li>P\u0101rstr\u0101des procenti<\/li>\n<li>P\u0101rbaudes p\u0101rkl\u0101juma nepiln\u012bbas<\/li>\n<li>Klientu atsauksmju noska\u0146ojuma tendences<\/li>\n<\/ul>\n<p>\u0160os r\u0101d\u012bt\u0101jus m\u0113s savienojam ar automatiz\u0113tiem br\u012bdin\u0101jumiem. Ja mode\u013ci main\u0101s \u0101rpus parastajiem robe\u017e\u0101m, attiec\u012bgie cilv\u0113ki nekav\u0113joties tiek inform\u0113ti. Ne n\u0101kam\u0101 m\u0113ne\u0161a riska p\u0101rskata san\u0101ksm\u0113. Tagad.<\/p>\n<h2>Ieskatu p\u0101rv\u0113r\u0161ana darb\u012bb\u0101<\/h2>\n<p>Dati bez darb\u012bbas ir tikai d\u0101rga izklaide.<\/p>\n<p>M\u016bsu Power BI risin\u0101jumus m\u0113s izstr\u0101d\u0101jam, pamatojoties uz l\u0113mumu pie\u0146em\u0161anas punktiem, nevis tikai uz datu punktiem. Katrs inform\u0101cijas panelis sniedz atbildes uz konkr\u0113tiem jaut\u0101jumiem, kas veicina konkr\u0113tas darb\u012bbas.<\/p>\n<p><strong>Vad\u012bbas pane\u013ca jaut\u0101jumi:<\/strong><\/p>\n<ul>\n<li>Kuriem projektiem j\u0101piev\u0113r\u0161 uzman\u012bba nekav\u0113joties?<\/li>\n<li>Kur mums vajadz\u0113tu p\u0101rdal\u012bt resursus?<\/li>\n<li>K\u0101di riski apdraud m\u016bsu strat\u0113\u0123iskos m\u0113r\u0137us?<\/li>\n<\/ul>\n<p><strong>Projektu vad\u012bt\u0101ja pane\u013ca jaut\u0101jumi:<\/strong><\/p>\n<ul>\n<li>K\u0101di uzdevumi kav\u0113jas?<\/li>\n<li>Kuriem komandas locek\u013ciem ir p\u0101r\u0101k liela slodze?<\/li>\n<li>Kur rodas kvalit\u0101tes probl\u0113mas?<\/li>\n<\/ul>\n<p><strong>Risku p\u0101rvaldnieka pane\u013ca jaut\u0101jumi:<\/strong><\/p>\n<ul>\n<li>K\u0101di riska scen\u0101riji k\u013c\u016bst arvien ticam\u0101ki?<\/li>\n<li>K\u0101das riska mazin\u0101\u0161anas strat\u0113\u0123ijas darbojas?<\/li>\n<li>Kur mums ir nepiecie\u0161amas jaunas riska kontroles?<\/li>\n<\/ul>\n<p>Katr\u0101 pane\u013ca panel\u012b ir iek\u013cautas ieteicam\u0101s darb\u012bbas, pamatojoties uz datu mode\u013ciem. Nav j\u0101pr\u0101to, ko dar\u012bt t\u0101l\u0101k. Nav anal\u012bzes paral\u012bzes.<\/p>\n<p>M\u0113s veidojam ar\u012b scen\u0101riju model\u0113\u0161anas iesp\u0113jas. \"Kas notiks ar m\u016bsu laika grafiku, ja m\u0113s zaud\u0113sim \u0161o galveno resursu?\" \"K\u0101 20% bud\u017eeta samazin\u0101jums ietekm\u0113s m\u016bsu rezult\u0101tus?\" Atbildiet uz \u0161iem jaut\u0101jumiem, pirms tie k\u013c\u016bst par realit\u0101ti.<\/p>\n<h2>Re\u0101l\u0101 riska p\u0101rvald\u012bbas pan\u0101kumi<\/h2>\n<p>Vienam ra\u017eo\u0161anas nozares klientam b\u016bvniec\u012bbas projektos rad\u0101s naudas l\u012bdzek\u013cu iztr\u016bkums. Bud\u017eeta p\u0101rsnieg\u0161ana bija vid\u0113ji 30%. Grafiku kav\u0113jumi bija ikdieni\u0161\u0137a par\u0101d\u012bba.<\/p>\n<p>M\u0113s savienoj\u0101m vi\u0146u projektu vad\u012bbas datus, iepirkumu sist\u0113mas un finan\u0161u p\u0101rskatus Power BI. Likumsakar\u012bbas k\u013cuva ac\u012bmredzamas uzreiz.<\/p>\n<p>Materi\u0101lu izmaksu pieaugums netika atz\u012bm\u0113ts l\u012bdz ikm\u0113ne\u0161a bud\u017eeta p\u0101rskatiem. L\u012bdz tam laikam iepirkuma pas\u016bt\u012bjumi jau bija izdoti par paaugstin\u0101t\u0101m cen\u0101m. Groz\u012bjumu pas\u016bt\u012bjumi netika v\u0113rt\u0113ti, \u0146emot v\u0113r\u0101 kop\u0113jo ietekmi uz projektu, bet tikai ietekmi uz atsevi\u0161\u0137iem uzdevumiem.<\/p>\n<p>Resursu konflikti starp projektiem nebija redzami, l\u012bdz cilv\u0113ki neierad\u0101s darb\u0101.<\/p>\n<p>Power BI risin\u0101jums nodro\u0161in\u0101ja \u0161o savstarp\u0113ji saist\u012bto risku redzam\u012bbu re\u0101llaik\u0101. Materi\u0101lu izmaksu br\u012bdin\u0101jumi izrais\u012bja t\u016bl\u012bt\u0113ju iepirkumu p\u0101rskat\u012b\u0161anu. Groz\u012bjumu pas\u016bt\u012bjumu ietekme tika nov\u0113rt\u0113ta, \u0146emot v\u0113r\u0101 portfe\u013ca ierobe\u017eojumus, nevis tikai atsevi\u0161\u0137us projektus.<\/p>\n<p>Resursu sadal\u012bjums par\u0101d\u012bja konfliktus ned\u0113\u013c\u0101m iepriek\u0161, \u013caujot proakt\u012bvi piel\u0101got grafiku.<\/p>\n<p>Rezult\u0101ti p\u0113c se\u0161iem m\u0113ne\u0161iem: P\u0101rsniegtais bud\u017eets samazin\u0101j\u0101s l\u012bdz 8%. Laika grafika izpilde uzlaboj\u0101s par 40%. V\u0113l svar\u012bg\u0101k, vi\u0146us p\u0101rst\u0101ja p\u0101rsteigt probl\u0113mas.<\/p>\n<p>Programmat\u016bras izstr\u0101des uz\u0146\u0113mums izmantoja l\u012bdz\u012bgas pieejas kvalit\u0101tes riska p\u0101rvald\u012bbai. T\u0101 viet\u0101, lai lietot\u0101ja pie\u0146em\u0161anas test\u0113\u0161anas laik\u0101 atrastu defektus, vi\u0146i identific\u0113ja kvalit\u0101tes pasliktin\u0101\u0161an\u0101s mode\u013cus izstr\u0101des laik\u0101.<\/p>\n<p>Koda p\u0101rskat\u012b\u0161anas noraid\u012bjumu r\u0101d\u012bt\u0101ji, vien\u012bbas testu p\u0101rkl\u0101juma tendences un neveiksm\u012bgas izveides bie\u017eums \u013c\u0101va prognoz\u0113t kvalit\u0101tes probl\u0113mas tr\u012bs sprintus iepriek\u0161. Tas deva vi\u0146iem laiku piel\u0101got procesus, pirms pieg\u0101d\u0101t saboj\u0101tu programmat\u016bru.<\/p>\n<p>Klientu apmierin\u0101t\u012bbas r\u0101d\u012bt\u0101ji uzlaboj\u0101s 25%, jo maz\u0101k defektu non\u0101ca ra\u017eo\u0161an\u0101.<\/p>\n<h2>\u012asteno\u0161anas strat\u0113\u0123ija, kas faktiski darbojas<\/h2>\n<p>Nem\u0113\u0123iniet atrisin\u0101t visas riska probl\u0113mas pirmaj\u0101 dien\u0101. T\u0101 ir d\u0101rgas neveiksmes recepte.<\/p>\n<p>M\u0113s iev\u0113rojam m\u0113r\u0137tiec\u012bgu pieeju:<\/p>\n<p><strong>1. posms: izv\u0113lieties vienu lielu probl\u0113mu<\/strong><br \/>Izv\u0113lieties d\u0101rg\u0101ko vai bie\u017e\u0101k sastopamo risku. Izveidojiet atkl\u0101\u0161anas un rea\u0123\u0113\u0161anas iesp\u0113jas \u0161ai vien\u012bgajai probl\u0113mai. Pirms pievienojiet sare\u017e\u0123\u012bt\u012bbas pak\u0101pi, nodro\u0161iniet, lai t\u0101 darbotos perfekti.<\/p>\n<p><strong>2. posms: Saist\u012bto datu avotu savieno\u0161ana<\/strong><br \/>Kad pamatsist\u0113ma darbojas, pievienojiet datu avotus, kas nodro\u0161ina papildu kontekstu. Finan\u0161u dati bud\u017eeta riskiem. Resursu dati par grafika riskiem. Klientu atsauksmes par kvalit\u0101tes riskiem.<\/p>\n<p><strong>3. posms: papla\u0161in\u0101\u0161ana l\u012bdz saist\u012btiem riskiem<\/strong><br \/>Izmantojiet savu p\u0101rbaud\u012bto sist\u0113mu, lai risin\u0101tu n\u0101kamo liel\u0101ko risku kategoriju. J\u016bs virz\u012bsieties uz priek\u0161u \u0101tr\u0101k, jo infrastrukt\u016bra jau past\u0101v.<\/p>\n<p><strong>4. posms: Izveidot prognoz\u0113\u0161anas mode\u013cus<\/strong><br \/>Izmantojot v\u0113sturisko datu pl\u016bsmu, izstr\u0101d\u0101jiet prognoz\u0113\u0161anas anal\u012btiku. Ma\u0161\u012bnm\u0101c\u012b\u0161an\u0101s mode\u013ci, kas prognoz\u0113 riska varb\u016bt\u012bbu, pamatojoties uz pa\u0161reiz\u0113jiem apst\u0101k\u013ciem.<\/p>\n<p>\u0160\u0101das pieejas piln\u012bgai ievie\u0161anai nepiecie\u0161ami 6-12 m\u0113ne\u0161i. Ta\u010du 1. f\u0101zes rezult\u0101ti ir redzami da\u017eu ned\u0113\u013cu laik\u0101.<\/p>\n<p>L\u012bdztekus tehniskajai ievie\u0161anai m\u0113s uzst\u0101jam ar\u012b uz p\u0101rmai\u0146u p\u0101rvald\u012bbu. Vislab\u0101kais m\u0113rinstrumentu panelis pasaul\u0113 nav veiksm\u012bgs, ja cilv\u0113ki to neizmanto. Apm\u0101c\u012bba, procesu integr\u0101cija un kult\u016bras pie\u0146em\u0161ana ir tikpat svar\u012bga k\u0101 datu savienojumi.<\/p>\n<h2>Riska p\u0101rvald\u012bbas ROI m\u0113r\u012b\u0161ana<\/h2>\n<p>Laba riska p\u0101rvald\u012bba ietaupa naudu. Laba riska p\u0101rvald\u012bba pelna naudu.<\/p>\n<p>Lai pier\u0101d\u012btu Power BI ietekmi uz riska p\u0101rvald\u012bbu, m\u0113s sekojam l\u012bdzi konkr\u0113tiem r\u0101d\u012bt\u0101jiem:<\/p>\n<p><strong>Tie\u0161ie izmaksu ietaup\u012bjumi:<\/strong><\/p>\n<ul>\n<li>Samazin\u0101ts bud\u017eeta p\u0101rsniegums<\/li>\n<li>Maz\u0101k \u0101rk\u0101rtas resursu papildin\u0101jumu<\/li>\n<li>Zem\u0101kas p\u0101rstr\u0101des un kvalit\u0101tes izmaksas<\/li>\n<li>Samazin\u0101ts projektu atcel\u0161anas l\u012bmenis<\/li>\n<\/ul>\n<p><strong>Netie\u0161\u0101 v\u0113rt\u012bbas rad\u012b\u0161ana:<\/strong><\/p>\n<ul>\n<li>Uzlabota klientu apmierin\u0101t\u012bba<\/li>\n<li>Uzlabota komandas produktivit\u0101te<\/li>\n<li>Lab\u0101ka resursu izmanto\u0161ana<\/li>\n<li>\u0100tr\u0101ka projektu \u012bsteno\u0161ana<\/li>\n<\/ul>\n<p><strong>Riska reakcijas uzlabo\u0161ana:<\/strong><\/p>\n<ul>\n<li>Agr\u0101ka probl\u0113mu atkl\u0101\u0161ana<\/li>\n<li>\u0100tr\u0101ka l\u0113mumu pie\u0146em\u0161ana<\/li>\n<li>Prec\u012bz\u0101ki ietekmes nov\u0113rt\u0113jumi<\/li>\n<li>Lab\u0101ka seku mazin\u0101\u0161anas efektivit\u0101te<\/li>\n<\/ul>\n<p>Liel\u0101k\u0101 da\u013ca organiz\u0101ciju pirm\u0101 gada laik\u0101 redz 3-5x ROI. Laika gait\u0101 ietaup\u012bjumi palielin\u0101s, jo riska p\u0101rvald\u012bbas iesp\u0113jas k\u013c\u016bst arvien piln\u012bg\u0101kas.<\/p>\n<p>V\u0113l svar\u012bg\u0101k ir tas, ka nakt\u012b j\u016bs lab\u0101k gu\u013cat. Nek\u0101du nepat\u012bkamu p\u0101rsteigumu pirmdienas r\u012bta san\u0101ksm\u0113s. Nek\u0101du skaidrojumu vad\u012bt\u0101jiem, k\u0101p\u0113c projekti neizdev\u0101s bez br\u012bdin\u0101juma.<\/p>\n<p>J\u016bsu riska p\u0101rvald\u012bba k\u013c\u016bst proakt\u012bva, nevis reakt\u012bva. J\u016bs nov\u0113r\u0161at probl\u0113mas, nevis tikai dokument\u0113jat t\u0101s.<\/p>\n<p>Power BI p\u0101rv\u0113r\u0161 j\u016bsu datus prognoz\u0113\u0161an\u0101. Un prognoz\u0113\u0161ana p\u0101rv\u0113r\u0161 riska p\u0101rvald\u012bbu no izmaksu centra par konkurences priek\u0161roc\u012bbu.<\/p>\n<p>Jaut\u0101jums nav par to, vai varat at\u013cauties \u012bstenot lab\u0101ku riska p\u0101rvald\u012bbu. Jaut\u0101jums ir par to, vai j\u016bs varat at\u013cauties to nedar\u012bt.<\/p>\n<p>J\u016bsu konkurenti jau izmanto datus, lai redz\u0113tu ap st\u016briem. Riska p\u0101rvald\u012bbas jom\u0101 pan\u0101kt konkurentus ir d\u0101rgi. Vad\u012bt sp\u0113li ir izdev\u012bgi.<\/p>\n<\/div>\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Risku p\u0101rvald\u012bba bez datiem ir tikai min\u0113jumi. Un min\u0113jumi izn\u012bcina projektus. M\u0113s esam redz\u0113ju\u0161i, k\u0101 uz\u0146\u0113mumi ir sadedzin\u0101ju\u0161i miljonus, jo nesp\u0113ja paredz\u0113t probl\u0113mas. Br\u012bdin\u0101juma z\u012bmes bija redzamas. Dati bija pieejami. Bet neviens nesavienoja punktus, l\u012bdz bija par v\u0113lu. Power BI maina \u0161o sp\u0113li. T\u0101 p\u0101rv\u0113r\u0161 j\u016bsu izklied\u0113tos riska datus par krist\u0101la bumbu, lai ... <\/p>","protected":false},"author":2,"featured_media":13152,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-13943","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","latest_post"],"_links":{"self":[{"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/posts\/13943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/comments?post=13943"}],"version-history":[{"count":3,"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/posts\/13943\/revisions"}],"predecessor-version":[{"id":13961,"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/posts\/13943\/revisions\/13961"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/media\/13152"}],"wp:attachment":[{"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/media?parent=13943"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/categories?post=13943"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.leaplytics.de\/lv\/wp-json\/wp\/v2\/tags?post=13943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}