{"id":14650,"date":"2026-06-06T20:47:24","date_gmt":"2026-06-06T18:47:24","guid":{"rendered":"https:\/\/www.leaplytics.de\/?page_id=14650"},"modified":"2026-06-06T20:47:25","modified_gmt":"2026-06-06T18:47:25","slug":"sharepoint","status":"publish","type":"page","link":"https:\/\/www.leaplytics.de\/ro\/servicii\/sharepoint\/","title":{"rendered":"SharePoint"},"content":{"rendered":"<p><!-- SEITEN-TITEL: \"SharePoint that actually works for your team.\"\n     INTRO-ABSATZ: --><\/p>\n<p>Concepem \u0219i cre\u0103m liste, formulare, permisiuni \u0219i fluxuri de lucru SharePoint - direct \u00een chiria\u0219ul Microsoft 365. Structuri de date curate, formulare inteligente \u0219i procese automatizate care \u00eenlocuiesc foile de calcul \u0219i lan\u021burile de e-mail pe care echipa dvs. \u00eenc\u0103 se bazeaz\u0103.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 1: PROBLEM\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>SharePoint poate face mult mai mult dec\u00e2t ob\u021bine\u021bi de la el.<\/h2>\n<p>Majoritatea echipelor utilizeaz\u0103 SharePoint ca un depozit de fi\u0219iere de baz\u0103 sau ca o list\u0103 implicit\u0103 greoaie. Cu structura, formularele \u0219i automatizarea potrivite, SharePoint devine un instrument de afaceri adecvat - conectat la <a href=\"\/ro\/servicii\/aplicatii-de-putere\/\">Aplica\u021bii de putere<\/a>, <a href=\"\/ro\/servicii\/automatizarea-puterii\/\">Automatizarea puterii<\/a>, \u0219i <a href=\"\/ro\/servicii\/putere-bi\/\">Power BI<\/a>. Diferen\u021ba dintre ceea ce poate face SharePoint \u0219i ceea ce majoritatea organiza\u021biilor ob\u021bin din el este mare, iar aceasta este, de obicei, o problem\u0103 de configurare, nu o problem\u0103 de instrument.<\/p>\n<h3>Liste f\u0103r\u0103 structur\u0103<\/h3>\n<p>Tipuri de coloane gre\u0219ite, nicio regul\u0103 de validare, nicio denumire coerent\u0103. Utilizatorii introduc text liber acolo unde ar trebui s\u0103 existe o list\u0103 derulant\u0103, las\u0103 c\u00e2mpurile obligatorii goale, iar datele devin prea nesigure pentru a putea fi utilizate \u00een rapoarte. O list\u0103 care \u00eencepe dezordonat\u0103 devine \u0219i mai dezordonat\u0103 \u00een timp.<\/p>\n<h3>Formulare implicite care deruteaz\u0103 utilizatorii<\/h3>\n<p>Formularul SharePoint standard afi\u0219eaz\u0103 fiecare c\u00e2mp pentru fiecare utilizator \u00een ordinea \u00een care au fost ad\u0103ugate. C\u00e2mpurile obligatorii nu sunt impuse, dropdown-urile sunt liste plate, f\u0103r\u0103 logic\u0103, \u0219i nu exist\u0103 nicio indica\u021bie cu privire la ce trebuie pus unde. Rezultatul sunt date inconsecvente \u0219i utilizatori frustra\u021bi.<\/p>\n<h3>Nu exist\u0103 automatizare<\/h3>\n<p>Actualiz\u0103rile de stare \u0219i notific\u0103rile sunt gestionate manual - un e-mail de reamintire aici, un mesaj Teams acolo. Nimeni nu \u0219tie ce s-a schimbat f\u0103r\u0103 s\u0103 verifice direct lista. Aprob\u0103rile se afl\u0103 \u00een c\u0103su\u021bele de primire, f\u0103r\u0103 nicio pist\u0103 de audit. Nimic nu se mi\u0219c\u0103 dec\u00e2t dac\u0103 cineva \u00eel urm\u0103re\u0219te.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 2: WHAT WE DELIVER\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2 id=\"what-we-deliver\">Ce oferim.<\/h2>\n<p>Lucr\u0103m direct \u00een mediul dvs. Microsoft 365. F\u0103r\u0103 instrumente noi, f\u0103r\u0103 platforme externe, f\u0103r\u0103 ca datele s\u0103 p\u0103r\u0103seasc\u0103 organiza\u021bia dumneavoastr\u0103. SharePoint este coloana vertebral\u0103 - noi \u00eel facem s\u0103 func\u021bioneze corect.<\/p>\n<h3>Liste SharePoint personalizate<\/h3>\n<p>O list\u0103 SharePoint structurat\u0103 corespunz\u0103tor este baza oric\u0103rei solu\u021bii func\u021bionale. Noi proiect\u0103m \u0219i construim liste care reflect\u0103 modul \u00een care echipa dvs. lucreaz\u0103 de fapt - nu doar ceea ce face SharePoint din cutie. Aceasta include de obicei:<\/p>\n<ul>\n<li>Tipuri corecte de coloane: alegere, persoan\u0103, dat\u0103, calculat\u0103, c\u0103utare - nu doar text pe o singur\u0103 linie pentru orice<\/li>\n<li>Reguli de validare care impun calitatea datelor la punctul de intrare<\/li>\n<li>C\u00e2mpuri obligatorii condi\u021bionate - aplicate numai atunci c\u00e2nd se aplic\u0103<\/li>\n<li>Vizualiz\u0103ri multiple adaptate la diferite roluri \u0219i cazuri de utilizare<\/li>\n<li>Coloane indexate pentru performan\u021b\u0103 pe liste mai mari<\/li>\n<li>Formatarea coloanelor \u0219i coduri de culori pentru a face starea vizibil\u0103 dintr-o privire<\/li>\n<\/ul>\n<h3>\u00cenlocuirea formularului Power Apps<\/h3>\n<p>Formularul SharePoint implicit nu poate afi\u0219a sau ascunde c\u00e2mpuri \u00een func\u021bie de ceea ce selecteaz\u0103 utilizatorul. Nu poate aplica logica condi\u021bional\u0103, nu poate ghida utilizatorul printr-un proces \u00een mai mul\u021bi pa\u0219i \u0219i nu se poate adapta \u00een func\u021bie de rol. Modul nostru <a href=\"\/ro\/servicii\/aplicatii-de-putere\/\">Aplica\u021bii de putere<\/a> can\u0103 de \u00eenlocuire a formei p\u00e2nzei. Capacit\u0103\u021bile tipice includ:<\/p>\n<ul>\n<li>Dropdown-uri dinamice care filtreaz\u0103 pe baza selec\u021biilor anterioare<\/li>\n<li>Vizibilitate condi\u021bionat\u0103 a c\u00e2mpurilor - c\u00e2mpurile apar numai atunci c\u00e2nd sunt relevante<\/li>\n<li>Introducere ghidat\u0103 \u00een mai mul\u021bi pa\u0219i cu validare la fiecare pas<\/li>\n<li>C\u00e2mpuri preumplute pe baza profilului utilizatorului sau a intr\u0103rilor anterioare<\/li>\n<li>Layout prietenos pentru mobil pentru echipele de pe teren sau de la distan\u021b\u0103<\/li>\n<\/ul>\n<h3>Permisiuni \u0219i controlul accesului<\/h3>\n<p>Permisiunile \u00een SharePoint sunt puternice, dar u\u0219or de gre\u0219it. Noi proiect\u0103m \u0219i implement\u0103m structuri clare de permisiuni care ofer\u0103 utilizatorilor acces la ceea ce au nevoie \u0219i nimic mai mult. Domeniul de aplicare tipic include:<\/p>\n<ul>\n<li>Permisiuni la nivel de site, list\u0103 \u0219i bibliotec\u0103 aliniate la structura rolurilor dvs.<\/li>\n<li>Configurarea grupului Microsoft 365 \u0219i a grupului SharePoint<\/li>\n<li>permisiuni la nivel de element, dac\u0103 este necesar (acord\u00e2nd o aten\u021bie deosebit\u0103 implica\u021biilor asupra performan\u021bei)<\/li>\n<li>Atribuirea rolurilor de vizitator, membru \u0219i proprietar<\/li>\n<li>Configura\u021bie de partajare extern\u0103<\/li>\n<\/ul>\n<h3>Migra\u021bie \u0219i modernizare<\/h3>\n<p>Trecerea de la SharePoint vechi, liste \u00eenvechite sau procese bazate pe foi de calcul la o configurare SharePoint Online curat\u0103 \u0219i modern\u0103. Ne ocup\u0103m de migrarea complet\u0103, inclusiv:<\/p>\n<ul>\n<li>Maparea c\u00e2mpurilor de la structura surs\u0103 la structura \u021bint\u0103<\/li>\n<li>Cur\u0103\u021barea \u0219i transformarea datelor \u00eenainte de import<\/li>\n<li>Validarea datelor migrate \u00een raport cu sursa<\/li>\n<li>Gestionarea caracterelor speciale, a formatelor de date \u0219i a dependen\u021belor de c\u0103utare<\/li>\n<li>Migrarea din Excel, CSV, SharePoint on-premises sau SharePoint 2013\/2016<\/li>\n<\/ul>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 3: PROCESS\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>Cum func\u021bioneaz\u0103.<\/h2>\n<h3>1. Descoperire \u0219i cartografiere<\/h3>\n<p>Analiz\u0103m configura\u021bia existent\u0103, structurile de date \u0219i cerin\u021bele \u00eenainte de a scrie o singur\u0103 linie de configurare. Schi\u021b\u0103m ceea ce trebuie construit, migrat sau \u00eembun\u0103t\u0103\u021bit, identific\u0103m dependen\u021bele \u0219i convenim \u00een scris asupra domeniului de aplicare \u00eenainte de \u00eenceperea dezvolt\u0103rii.<\/p>\n<h3>2. Construi\u021bi<\/h3>\n<p>Listele, formularele, permisiunile \u0219i fluxurile de lucru sunt configurate direct \u00een chiria\u0219ul dvs. Microsoft 365. \u00cen cazul \u00een care este disponibil\u0103 o zon\u0103 de staging, dezvolt\u0103m mai \u00eent\u00e2i acolo \u0219i promov\u0103m live numai dup\u0103 revizuirea dvs. Actualiz\u0103ri scrise s\u0103pt\u0103m\u00e2nale ale stadiului.<\/p>\n<h3>3. Managementul UAT<\/h3>\n<p>Gestion\u0103m \u00eentregul proces de testare - crearea cazurilor de testare, coordonarea execu\u021biei, urm\u0103rirea \u0219i rezolvarea defectelor. Persoana de contact desemnat\u0103 de dvs. verific\u0103 \u00een func\u021bie de criteriile de acceptare convenite. Rezolv\u0103m orice abatere de la scop, iar dvs. semna\u021bi.<\/p>\n<h3>4. Predarea \u0219i documenta\u021bia<\/h3>\n<p>Transfer complet, inclusiv documenta\u021bia privind proiectarea listei, notele privind logica formularelor, rezumatul structurii permisiunilor \u0219i orice \u00eenregistr\u0103ri de migrare. Include 3 luni de remediere a defectelor dup\u0103 punerea \u00een func\u021biune. Suport continuu disponibil sub form\u0103 de abonament.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 4: USE CASES\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>Pentru ce ne folosesc clien\u021bii no\u0219tri.<\/h2>\n<h3><a href=\"\/ro\/servicii\/registrul-riscurilor\/\">Registrul riscurilor<\/a><\/h3>\n<p>O list\u0103 SharePoint structurat\u0103 este baza unui registru de riscuri corporativ - conectat la un formular inteligent Power Apps, la un tablou de bord Power BI \u0219i la alerte Power Automate. Unul dintre cele mai frecvente angajamente ale noastre, care acoper\u0103 30-40 de configura\u021bii la nivel de domeniu \u00eentr-o singur\u0103 list\u0103.<\/p>\n<h3>Urm\u0103rirea proiectelor<\/h3>\n<p>O list\u0103 de proiecte personalizat\u0103 care \u00eenlocuie\u0219te o foaie de calcul sau un tablou de sarcini generic. Configura\u021bia tipic\u0103 include atribuirea proprietarului, starea RAG cu formatare \u00een culori, datele etapelor, urm\u0103rirea fazelor, notific\u0103ri automate de modificare a st\u0103rii \u0219i o vizualizare a portofoliului de proiecte Power BI.<\/p>\n<h3>Registrul activelor \u0219i inventarului<\/h3>\n<p>Urm\u0103ri\u021bi echipamentele, licen\u021bele software, activele fizice sau hardware-ul IT cu ajutorul unei liste SharePoint structurate. Include ID-ul activului, loca\u021bia, proprietarul, starea, datele de garan\u021bie \u0219i alerte automate pentru re\u00eennoirile viitoare sau datele de revizuire.<\/p>\n<h3>Fluxuri de lucru HR &amp; Onboarding<\/h3>\n<p>Liste de verificare structurate cu alocarea sarcinilor, date limit\u0103, urm\u0103rirea finaliz\u0103rii \u0219i notific\u0103ri automate c\u0103tre manageri atunci c\u00e2nd etapele sunt dep\u0103\u0219ite. \u00cenlocuie\u0219te trackerele Excel partajate \u0219i lan\u021burile de e-mailuri.<\/p>\n<h3>Registrul furnizorilor \u0219i v\u00e2nz\u0103torilor<\/h3>\n<p>Date centralizate privind furnizorii, cu date de contract, atribuirea proprietarului, starea aprob\u0103rii, ata\u0219area de documente \u0219i memento-uri automate de re\u00eennoire. Adesea combinat cu un formular Power Apps pentru actualiz\u0103ri self-service pentru furnizori.<\/p>\n<h3>Liste de verificare a conformit\u0103\u021bii<\/h3>\n<p>Urm\u0103rire structurat\u0103 a conformit\u0103\u021bii cu proprietarul controlului, data scadent\u0103, ata\u0219area dovezilor \u0219i escaladare automat\u0103 atunci c\u00e2nd termenele limit\u0103 nu sunt respectate. Se alimenteaz\u0103 direct \u00eentr-un tablou de bord de conformitate Power BI.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 5: PRICING\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>Pre\u021buri transparente.<\/h2>\n<p>Lucr\u0103m pe baz\u0103 de timp \u0219i materiale. Pl\u0103ti\u021bi pentru zilele lucrate efectiv la un tarif fix pe zi - f\u0103r\u0103 presupuneri privind pre\u021bul fix, f\u0103r\u0103 costuri ascunse. Dac\u0103 dureaz\u0103 mai pu\u021bine zile dec\u00e2t s-a estimat, pl\u0103ti\u021bi mai pu\u021bin.<\/p>\n<ul>\n<li><strong>Tarif de zi:<\/strong> de la 800 \u20ac\/zi (net)<\/li>\n<li><strong>Redesenarea simpl\u0103 a listei sau \u00eenlocuirea formularului:<\/strong> 2-5 zile<\/li>\n<li><strong>Proiect mai mare (migr\u0103ri, permisiuni, liste multiple):<\/strong> 6-12 zile<\/li>\n<li><strong>Livrare:<\/strong> 100% de la distan\u021b\u0103<\/li>\n<li><strong>Facturare:<\/strong> dup\u0103 etapele convenite<\/li>\n<\/ul>\n<p>Tarife preferen\u021biale disponibile pentru clien\u021bii existen\u021bi \u0219i pentru angajamentele cu mai multe fluxuri de lucru.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 6: SOCIAL PROOF\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>De \u00eencredere pentru echipele din \u00eentreaga Europ\u0103.<\/h2>\n<blockquote>\n<p>LeapLytics a reproiectat \u00eentreaga noastr\u0103 structur\u0103 de registru de risc SharePoint - 37 de modific\u0103ri la nivel de c\u00e2mp, un formular Power Apps personalizat \u0219i gestionarea complet\u0103 a permisiunilor. Totul este acum curat, consecvent \u0219i conectat la tabloul nostru de bord Power BI.<\/p>\n<p>  <cite>- Echipa de risc \u0219i conformitate, Logistic\u0103, Germania<\/cite>\n<\/p><\/blockquote>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 7: WHY LEAPLYTICS\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>De ce LeapLytics?<\/h2>\n<h3>Lucr\u0103m \u00een chiria\u0219ul dvs.<\/h3>\n<p>Toat\u0103 dezvoltarea are loc direct \u00een mediul dvs. Microsoft 365. Nu exist\u0103 instrumente externe, nu exist\u0103 date care s\u0103 p\u0103r\u0103seasc\u0103 organiza\u021bia dvs., nu exist\u0103 infrastructur\u0103 nou\u0103 pe care s\u0103 o gestiona\u021bi sau pentru care s\u0103 pl\u0103ti\u021bi. Tot ceea ce construim este al dvs. \u0219i r\u0103m\u00e2ne \u00een mediul dvs. dup\u0103 predare.<\/p>\n<h3>SharePoint + Power Apps + Power Automate + Power BI<\/h3>\n<p>Nu construim doar liste - le conect\u0103m. O list\u0103 SharePoint este mai util\u0103 atunci c\u00e2nd formularul care o alimenteaz\u0103 este inteligent (<a href=\"\/ro\/servicii\/aplicatii-de-putere\/\">Aplica\u021bii de putere<\/a>), evenimentele pe care le declan\u0219eaz\u0103 sunt automatizate (<a href=\"\/ro\/servicii\/automatizarea-puterii\/\">Automatizarea puterii<\/a>), iar datele pe care le con\u021bine sunt vizibile \u00eentr-un tablou de bord live (<a href=\"\/ro\/servicii\/putere-bi\/\">Power BI<\/a>). Noi proiect\u0103m \u0219i construim stack-ul complet.<\/p>\n<h3>Cunoa\u0219terea domeniului \u00een toate industriile<\/h3>\n<p>Am creat solu\u021bii SharePoint pentru managementul riscului, conformitate, opera\u021biuni, finan\u021be, resurse umane \u0219i IT. \u00cen\u021belegem logica de afaceri din spatele structurilor de date pe care le construim - nu doar configura\u021bia tehnic\u0103. Acest lucru \u00eenseamn\u0103 mai pu\u021bine itera\u021bii \u0219i un rezultat care se potrive\u0219te de fapt modului \u00een care lucreaz\u0103 echipa dumneavoastr\u0103.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 8: FAQ\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>\u00centreb\u0103ri frecvente.<\/h2>\n<h3>Avem nevoie de licen\u021be suplimentare pentru dezvoltarea SharePoint?<\/h3>\n<p>SharePoint este inclus \u00een toate planurile Microsoft 365 Business \u0219i Enterprise. Power Apps \u0219i Power Automate cu conectori SharePoint standard sunt, de asemenea, incluse \u00een majoritatea planurilor (Business Standard, E3, E5 \u0219i superioare). Nu sunt necesare licen\u021be suplimentare pentru un angajament SharePoint tipic. V\u0103 confirm\u0103m dreptul \u00eenainte de a \u00eencepe.<\/p>\n<h3>Pute\u021bi lucra cu mediul nostru SharePoint existent?<\/h3>\n<p>Da. V\u0103 evalu\u0103m mai \u00eent\u00e2i configura\u021bia actual\u0103 \u0219i construim \u00een jurul a ceea ce ave\u021bi deja. Nu avem nevoie de un mediu curat sau de un nou site SharePoint. \u00cen majoritatea cazurilor, \u00eembun\u0103t\u0103\u021bim \u0219i extindem ceea ce exist\u0103 deja.<\/p>\n<h3>Pute\u021bi migra date din foi de calcul sau din SharePoint vechi?<\/h3>\n<p>Da. Migrarea datelor din Excel, CSV sau liste SharePoint vechi face parte din oferta noastr\u0103 standard. Map\u0103m c\u00e2mpurile existente \u00een noua structur\u0103, cur\u0103\u021b\u0103m datele acolo unde este necesar \u0219i le import\u0103m cu verific\u0103ri de validare. Ve\u021bi ob\u021bine date curate \u0219i structurate din prima zi.<\/p>\n<h3>C\u00e2t dureaz\u0103 un proiect SharePoint tipic?<\/h3>\n<p>O simpl\u0103 reproiectare a unei liste sau \u00eenlocuirea unui formular dureaz\u0103 de obicei 2-5 zile. Un proiect mai amplu care include migr\u0103ri, permisiuni pe mai multe site-uri \u0219i mai multe liste dureaz\u0103 de obicei \u00eentre 6 \u0219i 12 zile. \u00cenainte de a \u00eencepe, v\u0103 oferim o estimare scris\u0103 a domeniului de aplicare, astfel \u00eenc\u00e2t s\u0103 \u0219ti\u021bi la ce s\u0103 v\u0103 a\u0219tepta\u021bi.<\/p>\n<h3>Lucra\u021bi la fa\u021ba locului?<\/h3>\n<p>Toate lucr\u0103rile sunt livrate de la distan\u021b\u0103, ca standard, din Germania. Vizitele la fa\u021ba locului pot fi aranjate de comun acord - de exemplu, pentru sesiuni de lansare sau de punere \u00een func\u021biune. Costurile de deplasare sunt facturate la pre\u021bul de cost, cu aprobare scris\u0103 prealabil\u0103.<\/p>\n<h3>De asemenea, pute\u021bi conecta SharePoint la Power BI sau Power Automate?<\/h3>\n<p>Da - \u0219i o facem adesea. O list\u0103 SharePoint conectat\u0103 la un tablou de bord Power BI \u0219i automatizat\u0103 cu fluxuri Power Automate este o combina\u021bie comun\u0103. \u00cen cazul \u00een care este necesar, evalu\u0103m \u0219i construim toate trei ca un singur angajament.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 9: RELATED SERVICES\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>Adesea combinat cu SharePoint.<\/h2>\n<h3><a href=\"\/ro\/servicii\/aplicatii-de-putere\/\">Aplica\u021bii de putere<\/a><\/h3>\n<p>\u00cenlocui\u021bi formularul SharePoint implicit cu o aplica\u021bie canvas inteligent\u0103. Logic\u0103 condi\u021bional\u0103, dropdown-uri dinamice, intrare ghidat\u0103 \u00een mai mul\u021bi pa\u0219i \u0219i aspect preg\u0103tit pentru mobil. Cea mai frecvent\u0103 ad\u0103ugare la orice list\u0103 SharePoint construit\u0103.<\/p>\n<h3><a href=\"\/ro\/servicii\/automatizarea-puterii\/\">Automatizarea puterii<\/a><\/h3>\n<p>Automatiza\u021bi notific\u0103rile, aprob\u0103rile \u0219i actualiz\u0103rile de stare declan\u0219ate direct din evenimentele listei SharePoint. Modific\u0103ri de stare, elemente noi, date dep\u0103\u0219ite - toate sunt gestionate automat, f\u0103r\u0103 ca cineva s\u0103 fie nevoit s\u0103 verifice lista manual.<\/p>\n<h3><a href=\"\/ro\/servicii\/putere-bi\/\">Consultan\u021b\u0103 Power BI<\/a><\/h3>\n<p>Transforma\u021bi datele din listele SharePoint \u00een tablouri de bord \u0219i rapoarte live. Portofolii de riscuri, starea proiectelor, urm\u0103rirea conformit\u0103\u021bii, registre de active - orice date SharePoint structurate pot alimenta un tablou de bord Power BI.<\/p>\n<p><!-- \u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\n     SECTION 10: CTA\n\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550\u2550 --><\/p>\n<h2>S\u0103 ne ocup\u0103m de SharePoint.<\/h2>\n<p>Spune\u021bi-ne cu ce lucra\u021bi \u0219i de ce ave\u021bi nevoie - vom reveni cu un scop orientativ \u0219i o estimare \u00een termen de 24 de ore. Nu este necesar niciun angajament.<\/p>\n<p><a href=\"\/ro\/kontakt\/\" class=\"btn-readmore\">Intra\u021bi \u00een contact<\/a><\/p>\n<p>Sau trimite\u021bi-ne un e-mail direct la <a href=\"\/ro\/m&\/#97;&#105;&#x6c;&#x74;o&#58;&#105;&#x6e;&#x66;&#x6f;&#64;&#108;&#101;&#x61;&#x70;ly&#116;&#x69;&#x63;&#x73;&#46;&#100;&#101;\">info@leaplytics.de<\/a><\/p>\n<hr>\n<p><strong>Servicii conexe:<\/strong> <a href=\"\/ro\/servicii\/aplicatii-de-putere\/\">Aplica\u021bii de putere<\/a> - <a href=\"\/ro\/servicii\/automatizarea-puterii\/\">Automatizarea puterii<\/a> - <a href=\"\/ro\/servicii\/putere-bi\/\">Consultan\u021b\u0103 Power BI<\/a> - <a href=\"\/ro\/servicii\/registrul-riscurilor\/\">Registrul riscurilor<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Proiect\u0103m \u0219i realiz\u0103m liste, formulare, permisiuni \u0219i fluxuri de lucru \u00een SharePoint \u2013 direct \u00een contul dvs. Microsoft 365. Structuri de date bine organizate, formulare inteligente \u0219i procese automatizate care \u00eenlocuiesc foile de calcul \u0219i lan\u021burile de e-mailuri pe care echipa dvs. \u00eenc\u0103 se bazeaz\u0103. SharePoint poate face mult mai mult dec\u00e2t ceea ce profita\u021bi de el \u00een prezent. Majoritatea echipelor folosesc SharePoint ca \u2026 <\/p>","protected":false},"author":2,"featured_media":0,"parent":14654,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-14650","page","type-page","status-publish","hentry","latest_post"],"_links":{"self":[{"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/pages\/14650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/comments?post=14650"}],"version-history":[{"count":4,"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/pages\/14650\/revisions"}],"predecessor-version":[{"id":14682,"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/pages\/14650\/revisions\/14682"}],"up":[{"embeddable":true,"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/pages\/14654"}],"wp:attachment":[{"href":"https:\/\/www.leaplytics.de\/ro\/wp-json\/wp\/v2\/media?parent=14650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}